Our onshore wind farms

Operational
  • Amazon Wind Farm Northern Ireland – Ballykeel
    Amazon Wind Farm Northern Ireland - Ballykeel


    Location:
    Ballykeel and Old Freehold townlands on the outskirts of Larne, Co. Antrim, Northern Ireland.
    Number of turbines: 7
    Installed capacity: 16 MW
    In commercial operation since: June 2023

     

  • Ballymartin
    Ballymartin


    Location:
    7 km west of Mullinavat, County Kilkenny, Republic of Ireland, alongside the Smithstown wind farm
    Number of turbines: 3
    Installed capacity: 6.9 MW
    In commercial operation since: June 2011

  • Booltiagh 1
    Booltiagh 1

    Location: 15 km west of Ennis, County Clare, Republic of Ireland, along with Booltiagh 2
    Number of turbines: 12
    Installed capacity: 18 MW
    In commercial operation since: October 2005

    Read more about Booltiagh 1

     

  • Booltiagh 2
    Booltiagh 2


    Location: 25 km north-west of Cashel, County Tipperary, Republic of Ireland, on the same site as Booltiagh 1
    Number of turbines: 6
    Installed capacity: 12 MW
    In commercial operation since: September 2013

     

  • Flughland
    Flughland


    Location:
    44 km west of Letterkenny, County Donegal, Republic of Ireland, close to Sorne 1 and Sorne 2
    Number of turbines: 4
    Installed capacity: 9.2 MW
    In commercial operation since: August 2009

     

  • Garracummer
    Garracummer


    Location:
    25 km north-west of Cashel, County Tipperary, Republic of Ireland
    Number of turbines: 17
    Installed capacity: 42.5 MW
    In commercial operation since: March 2013

     

  • Gneeves
    Gneeves


    Location: 6 km south-west of Millstreet, County Cork, Republic of Ireland
    Number of turbines: 11
    Installed capacity: 9.4 MW
    In commercial operation since: June 2006

     

  • Inchincoosh
    Inchincoosh


    Location: 7 km north of Kilgarvan village in County Kerry, Republic of Ireland (extension of Kilgarvan, along with Sillahertane)
    Number of turbines: 13
    Installed capacity: 32.5 MW
    In commercial operation since: June 2009

     

  • Kilgarvan
    Kilgarvan



    Location: 7 km north of Kilgarvan, County Kerry, Republic of Ireland
    Number of turbines: 15
    Installed capacity: 45 MW
    In commercial operation since: November 2007


  • Knockawarriga 1

    Knockawarriga 1



    Location: 12 km south-east of Abbeyfeale in County Limerick, Republic of Ireland
    Number of turbines: 9
    Installed capacity: 22.5 MW
    In commercial operation since: August 2008
  • Knockawarriga 2
    Knockawarriga 2


    Location: 12 km south-east of Abbeyfeale in County Limerick, Republic of Ireland
    Number of turbines: 3
    Installed capacity: 7.5 MW
    In commercial operation since: January 2020


  • Lisheen 1
    Lisheen 1


    Location:
    10 km east south-east of Templemore, County Tipperary, Republic of Ireland
    Number of turbines: 18
    Installed capacity: 36 MW
    In commercial operation since: September 2009

     

    Lisheen onshore wind farm map
  • Lisheen 2
    Lisheen 2

    Location: 10 km east south-east of Templemore, County Tipperary(extension of Lisheen1)
    Number of turbines: 12
    Installed capacity: 24 MW
    In commercial operation since: June 2013

     

  • Lisheen 3
    Lisheen 3

    Location: 3 km west of Crosspatrick village, spanning County Laois and County Kilkenny (extension of Lisheen 1 & 2)
    Number of turbines: 8
    Installed capacity: 28.8 MW
    In commercial operation since: March 2023

  • Mienvee
    Mienvee


    Location: Holyford, County Tipperary, Republic of Ireland, within Garracummer wind farm
    Number of turbines: 1
    Installed capacity: 0.9 MW
    In commercial operation since: October 2004

     

  • Owenreagh 1
    Owenreagh 1


    Location:
    County Tyrone, Northern Ireland, along with Owenreagh 2
    Number of turbines: 9
    Installed capacity: 2.5 MW
    In commercial operation since: April 1997

     

  • Owenreagh 2
    Owenreagh 2


    Location:
    County Tyrone, Northern Ireland, along with Owenreagh 1
    Number of turbines: 6
    Installed capacity: 2.6 MW
    In commercial operation since: 2008

     

  • Sillahertane
    Sillahertane


    Location:
    7 km north of Kilgarvan, County Kerry, Republic of Ireland (extension of Kilgarvan, along with Inchincoosh)
    Number of turbines: 10
    Installed capacity: 8.5 MW
    In commercial operation since: June 2009

     

  • Smithstown
    Smithstown


    Location: County Kilkenny, Republic of Ireland
    Number of turbines: 4
    Installed capacity: 8 MW
    In commercial operation since: August 2013


  • Sorne 1
    Sorne 1


    Location: 9 km east of Buncrana, County Donegal, Republic of Ireland, together with Sorne 2, close to Flughland
    Number of turbines: 16
    Installed capacity: 32 MW
    In commercial operation since: January 2006

     

  • Sorne 2
    Sorne 2


    Location: 9 km east of Buncrana, County Donegal, Republic of Ireland, close to Flughland (extension of Sorne 1)
    Number of turbines: 3
    Installed capacity: 6.9 MW
    In commercial operation since: January 2009

     

In development
  • Coom Green Energy Park
    Coom Green Energy Park


    Location: County Cork, Republic of Ireland

    Partnership: 50:50 partnership with Coillte

    Installed capacity (Ørsted and Coillte): 105.6 MW

    Target to enter commercial operation in: 2026

    Read more at https://coomgreenenergypark.com/

  • Cloghercor
    Cloghercor


    Location: County Donegal, Republic of Ireland

    Partnership: 50:50 partnership with Coillte

    Total installed capacity (Ørsted and Coillte): 125.4 MW

    Target to enter commercial operation in: 2027

    Read  more at https://cloghercorwindfarm.com/

  • Ballinagree
    Ballinagree


    Location: County Cork, Republic of Ireland

    Partnership: 50:50 partnership with Coillte

    Total installed capacity (Ørsted and Coillte): 106.4 MW

    Target to enter commercial operation in: 2026

    Read more at www.ballinagreewindfarm.ie/

  • Craignagapple

    Craignagapple


    Status: In development

    Location: County Tyrone

    Total installed capacity: From 50MW to 77MW

    Target to enter commercial operation in: 2028

    Read more at www.craignagapplewindfarm.com
  • Farranrory wind farm

    Farranrory wind farm


    Status: In development

    Location: County Tipperary

    Total installed capacity: Up to 9 turbines and 45-50MW

    Target to enter commercial operation in: 2026

    Read more at www.farranrorywindfarm.com 
  • Kilgarvan Repower

    Kilgarvan Repower


    Status: In development
    Location: County Kerry
    Total Installed Capacity: Up to 79.2MW
    Target to Enter Commercial Operation: 2029

    Read more about Kilgarvan Repower

  • Oatfield
    Oatfield


    Location: County Clare, Republic of Ireland

    Installed capacity: 50+ MW

    Target to enter commercial operation in: 2026

    Read more about Oatfield